Plans have been approved to extend and refurbish Wasdell Group’s Groundwell site in Swindon.

The Anderson + Prescott designed scheme, planned by Turley and approved by Swindon Borough Council, will deliver the latest in production packaging, storage, and distribution on the site of the current operational location.

Anderson + Prescott director David Anderson said: “Our design proposes a complete architectural transformation, combining increased capacity and operational efficiency with a people-first working environment.

“A standout feature is the new office and welfare pod, which will be clad in light-toned larch timber with a green roof and living wall. It is designed as a calm, uplifting space for staff, using sustainable natural materials and biophilic design to enhance wellbeing and biodiversity.”

The existing obsolete metal façade of the warehouse will be replaced with more sustainable mineral fibre polychromatic cladding panels in a natural green-brown colour, designed to shift subtly with light and movement.

The cladding will wrap around both new and existing sections and solar panels will be installed across the roofs.

David Anderson added: “With this consent now in place,  we are excited to be involved in the next stages of project, maintaining our shared commitment to deliver best in class facilities that balance performance, sustainability, and staff wellbeing.”

© Thames Tap (powered by ukpropertyforums.com).

Sign up to receive our weekly free journal, The Forum here.